Project Location: Harlow 

Client: Quality Park

Cost: £500.000

Steel Fabricator: Metallico Ltd

Completion: 2019

The site contains a two-storey, detached house located on North London. New roof extension and side extension has been provided to increase the floor area to add a cinema room at ground floor and master bedroom in roof space.

Major internal structural alterations were carried to suit new internal layouts and existing trussed roof was re-constructed in steel frame.

Project Location: Hadley Wood

Client: Private

Cost: £300.000

Contractor: Metallico Ltd

Completion: 2017

Extension of light-weight industry warehouse. The project consists of new bay with 13m span, along the western and southern perimeter of existing warehouse approximately 10000 sqf. We proposed a mono-pitch steel portal frame, at 7.3m centres, with metal sheeting for the roof and facade.

The foundations comprised pad footings and ground-bearing slab.

About

HGI structures provide a full range of professional services in the field of build design and project management for both new build and refurbishment projects.

Opening Timings

Monday to Friday: 08:30 – 18:00

Saturday: 08:30 – 15:00

Sunday: Closed

Contact

Phone:  02037454835

Email: info@hgi-structures.co.uk

Address: Dean House, 193 High Street, Ponders End, EN3 4EA